Skip to content
For construction & materials suppliers

Heavy loads.
Legal routes.
On site by 7.

Dispatch for suppliers moving lumber, drywall, steel, and aggregate into active jobsites. Routes respect weight limits, low clearances, and permitted truck corridors — so the load arrives inside the crew's window.

Bring a real multi-site delivery list to the demo. We sequence it on the call.

Why generic route apps fail materials delivery.

The constraints aren't optional. Miss one and the run falls apart.

Weight and height restrictions

A loaded flatbed can't take the parkway or squeeze under an 11'8" bridge. Consumer routing ignores both and sends drivers into routes they legally can't run.

Permits and oversize corridors

Oversize and overweight loads are legal only on specific corridors at specific times. Miss that and it's a fine plus a stranded truck.

Jobsite receiving windows

Crews need materials staged before the day starts. A late drop stalls the whole trade and the GC remembers it.

Disputed deliveries and short loads

Sites deny receiving full counts. Without a photo and signature at the gate, short-load claims eat your margin.

How BoxTruckSprinter handles it.

Every pain point above has a concrete, in-product answer.

Weight & clearance-aware routing

Per NYC DOT commercial vehicle maps: parkways blocked, truck corridors preferred, low clearances avoided on every route.

Permitted-corridor planning

Keep oversize loads on the corridors and time windows they're actually permitted for, instead of the shortest illegal line.

Window-first sequencing

Tag each jobsite with a staging window. The optimizer honors the window first and mileage second, so crews aren't waiting on trucks.

Photo + signature at the gate

Driver captures the drop and a signature on the phone. Short-load disputes are settled with a geotagged photo, not a phone argument.

Live 511NY incident feeds

Expressway backed up? The route switches before the driver sits in it, so the 7am staging deadline still holds.

Recurring supply runs

Standing deliveries to long-run jobsites get scheduled once and materialize as a routed trip each morning.

We had a driver take a bridge he shouldn't have. Once. The routing now just won't build that line, and my dispatcher stopped hand-checking every heavy load against the clearance map.
Yard manager
Building-materials supplier · 16 trucks · active NYC jobsites

Where the dollars come back.

Modeled for a typical 10–20 vehicle materials fleet.

0
Bridge strikes
Clearance-aware routing, every route, every driver.
-$4.1K
Fuel / month
Fewer wrong-corridor reroutes on heavy loads.
-$3-5K
Short-load claims
Gate photo + signature kills disputes.
+14%
On-time staging
Windows respected before the crew starts.
-31%
Dispatcher hours
Multi-site runs sequenced in minutes.
Legal
Every corridor
Weight, height, and permit rules applied.

Send us tomorrow's delivery list.
We'll route it on the call.

15-minute demo. Bring real jobsite addresses with staging windows and load types. You leave with a legal, sequenced route and a staging time the crew can plan around.